Pool House Construction: Costs, Steps and Planning

A pool house in the US typically costs somewhere between $100 and $300 per square foot, and the final number depends mostly on three things: the size, whether it has plumbing, and how close it sits to existing utilities. The smoothest builds are run by one licensed crew from foundation to finish, because a pool house combines concrete, framing, plumbing, electrical and weatherproofing in one small building. At A&E Hardscape & Construction, our in-house crew handles outdoor structures such as sheds, pool houses and outbuildings across Utah, with no subcontractors.
TL;DR
- Budget about $100 to $300 per square foot, with plumbing and finish level moving you within that range.
- Write down the three things the building must do (changing, storage, bathroom, guest space) before anything else. That list sets size, layout and cost.
- Permits depend on size and utilities. Many cities require one for any plumbing or electrical work, so confirm with your city before design is final.
- A stick-built pool house usually takes 8 to 12 weeks once work starts, so plan it outside of pool season.
- Foundation, utility runs and finishes are where budgets drift. Settle them in the estimate, not mid-build.
Table of Contents
- What a pool house is, and what it can be
- How much a pool house costs
- Decide what the building is for
- Permits, setbacks and whether anyone can live in it
- The main stages of a pool house build
- Ways to keep the budget under control
- Our perspective
- Get a pool house estimate in Utah
- FAQ
- Sources
What a pool house is, and what it can be
A pool house is a small detached building beside a pool or backyard that supports how you use it. At its simplest it is a changing room with storage for towels, floats and pool equipment. At the other end it is a finished space with a bathroom, a kitchenette, air conditioning and room for guests.
That range is why prices vary so widely. Two homeowners can both say “pool house” and mean a 120-square-foot shed or a 400-square-foot guest suite. One design guide puts a changing-and-storage building at about 120 square feet, while a building that doubles as a guest suite needs 400 square feet or more, plus HVAC and a kitchenette.
You do not need a pool to want one. In Utah, where backyards are often used for entertaining much of the year, the same structure works as a covered lounge, an outdoor kitchen companion or a place to retreat from the sun.

How much a pool house costs
Published figures are wide because they mix very different buildings. Here is what the sources show, with the type of structure behind each number.
| Source | What it covers | Figure |
|---|---|---|
| Build-Construct (2026) | Pool house construction, depending on finishes and plumbing | $100 to $300 per sq ft |
| Builds and Buys (2025) | Fully finished, stick-built | $100 to $150 per sq ft |
| Builds and Buys (2025) | 300 to 400 sq ft with full bath | $30,000 to $45,000 basic, $45,000 to $55,000 premium |
| Fox Blocks | Detached 300 sq ft example | About $114,000 |
| Fox Blocks | Prefab to high-end | From $26,000 to over $180,000 |
The spread is not an error. A 300-square-foot building at $100 per square foot is $30,000, and at $300 it is $90,000. Finish level, plumbing and site conditions explain the gap. Treat any single national average as a starting point and get a written estimate for your own lot. These are national figures, not Utah quotes. Mountain and foothill lots, rock, slope and frost depth can all change the site work.
What drives the number
Size. Every extra 100 square feet adds framing, roofing, slab and finishes. The cheapest way to control cost is a tighter function list, not cheaper materials.
Plumbing and a bathroom. A bathroom brings water supply, drainage, venting and a water heater. Build-Construct advises keeping utility runs short, since water, power and drainage cost less when the building sits near existing services. Drainage is also the part that causes problems later, so a guide on prioritizing drainage in bathroom plumbing costs is a good read when you are budgeting for it.
Foundation. A slab or footings must suit your soil and frost line. We pour small-scale foundations and footings as part of our concrete work, so the base and the building come from the same crew.
Finishes and climate control. Insulation, heating, cooling, flooring and glazing are where a $30,000 building becomes a $90,000 one.
Site prep and waste. Excavation, grading and debris removal are easy to leave out of a budget. A 10-yard dumpster from us is priced at $250 to $400 per rental, and a 15-yard at $300 to $500, which is a small line item next to the build but one that has to be planned.
Decide what the building is for
Before you ask for any estimate, write down the three activities the building must support. This single list drives the floor plan, and it should exist before any framing is drawn.
Useful questions:
- Is it only for changing and storage, or will guests use it overnight?
- Do you need a shower, toilet or full bath?
- Will food be prepared there? If so, would an outdoor kitchen island next to the building do the job at a lower cost than a kitchenette inside?
- Do you want it open to the patio, or closed and climate-controlled?
Wet and dry zones
A pool house sees wet feet, humid air and temperature swings. Separate the wet zone (shower, changing area, entry from the pool) from the dry zone (seating, storage, electronics). Plan ventilation, lighting, flooring and storage together. Fox Blocks recommends matching the floor plan and look to the main home and treating privacy as a design requirement, using blinds, frosted glazing or screens for changing and guest use.

Materials that handle damp
Framing is usually timber (wood) for speed and easy insulation, or block and concrete for a more permanent, house-like building. Whichever you choose, moisture protection matters at every surface. A concrete slab should be checked for moisture before flooring goes on, and this contractor checklist on moisture in concrete explains why. For trim and exterior details, see how polyurethane mouldings resist moisture, which suits humid pool-side conditions.
Permits, setbacks and whether anyone can live in it
Rules are set by your city or county, not by the state alone, so the right answer depends on your address. A few patterns are common across Utah cities.
A permit is often required. Riverton, Utah, for example, requires a building permit for accessory structures except small one-story sheds of 200 square feet or less, and it requires a permit for any plumbing, electrical or gas line. A pool house with a bathroom or power will almost always fall on the permit side.
Setbacks apply. The same Riverton page says accessory structures generally must sit at least 5 feet from property lines and cannot be built over easements. Other cities set their own distances, so check yours.
Living space is a different category. Many cities treat a pool house and a dwelling differently. Rancho Cucamonga, California, bars indoor cooking facilities and full-time living or rental in accessory structures, and that is a typical example of why a pool house with a kitchen and bed can cross a line. If you want someone to live in the building, the project is no longer a pool house but an accessory dwelling unit, with its own rules. We also build ADUs, so we can tell you early which path your plan belongs on.
Pool safety is separate. If the pool is new or being modified, barriers and gates have their own code. Our guide to pool safety fence height, gates and code covers it.
Confirm requirements with your city’s building department before the design is fixed. It is cheaper to change a drawing than a finished wall.
The main stages of a pool house build
A stick-built pool house of moderate size typically runs 8 to 12 weeks once construction starts, not counting design and permitting. The order is the same for most projects.
- Plan and estimate. Fix the function list, size and location, and get a written estimate. Choose a spot near existing water, power and drainage to keep utility runs short.
- Permits. Submit plans to your city for the building, plumbing and electrical work that needs approval.
- Site preparation. Clear and level the area, excavate for footings and handle drainage so water runs away from the building. A dumpster on site keeps this stage tidy.
- Foundation. Pour the slab or footings. Let the concrete cure properly and check moisture before finishing floors.
- Framing and roof. Build the walls, set the roof and add overhangs. Overhangs and glazing placement affect weathering, glare and heat gain.
- Rough-in. Run plumbing, electrical and any HVAC lines before walls close up. This is where inspections usually happen.
- Insulation, exterior and interior finishes. Weatherproof cladding, drywall or finished panels, flooring suited to wet feet, and fixtures.
- Hardscape around the building. A paver surface connecting the pool house, pool deck and yard completes it. See paver patio installation steps and base depths for how that base is built.
- Final inspection and walkthrough.
Several trades touch the same building: concrete, carpentry, plumbing, electrical and paving. When different subcontractors handle each, gaps in schedule and responsibility are where delays begin. We build with our own licensed crew and use no subcontractors, so the sequence above is one team’s schedule.
Ways to keep the budget under control
- Start with the function list. Cut a feature, not quality. A pool house without a kitchenette but with a good outdoor kitchen nearby often costs less.
- Keep it near services. Short trenches for water, power and drainage save real money.
- Choose open or covered structures where they fit. If you need shade and a place to sit more than a place to change, a patio cover or gazebo may meet the need at a lower price. See also backyard shade options and costs.
- Price the whole project. Include permits, site work, hardscape around the building, and debris removal, so the estimate matches the real total.
- Build once. Adding plumbing, power or a patio later means opening finished work.
Our perspective
A pool house is a small building that asks a lot of the people who build it. It has a slab that must drain, walls that live in humidity, a roof exposed to Utah sun and snow, and a patio that must join cleanly to the pool deck.
We are a licensed general contractor, and every project we do is built by our in-house crew, with no subcontractors. For a pool house that matters, because the concrete, the structure and the paving all meet at the same few feet of your yard. One team means one schedule and one person to call.
We have completed over 200 projects across Utah, from Cedar City to Park City, and we give free estimates. Our advice is always to decide what the building is for first, then price the whole project, including site work and hardscape, before you commit.
Blog
Get a pool house estimate in Utah
If you are planning a pool house, a poolside lounge or another backyard structure, we can walk the site, discuss the function list and give you a free estimate. Our outdoor structures page shows the pool houses, sheds and outbuildings we build, and the same crew can handle the concrete, paving and fencing around it.

Need the site cleared first? We also offer dumpster rental and construction waste removal for residential and commercial projects, so debris from demolition or excavation does not pile up in your yard.
FAQ
How much does it cost to build a pool house?
Most published figures land between $100 and $300 per square foot, depending on finishes and plumbing. A 300-square-foot pool house therefore runs from about $30,000 to $90,000, and high-end builds go beyond that. Your lot, foundation and utility distance decide where you land, so a site-specific estimate is the reliable number.
Do I need a permit for a pool house?
Usually yes if it has plumbing, electrical or gas, and often for any building above a small size. Riverton, Utah, for instance, exempts only small sheds of 200 square feet or less and still requires permits for utility lines. Check with your city’s building department for your address.
Can someone live in a pool house?
Not usually as a pool house. Many cities do not allow accessory structures designed for full-time living or with full cooking facilities. If you want guest or long-term living space, the project is typically an accessory dwelling unit, which has its own permit path.
How long does it take to build one?
A stick-built pool house typically takes 8 to 12 weeks of construction, plus time for design and permits. Larger, finished buildings with bathrooms and climate control take longer than simple changing rooms.
How big should a pool house be?
As small as the function list allows. A changing-and-storage building can be around 120 square feet, while a guest-suite style building needs 400 square feet or more with HVAC and a kitchenette. Size is the biggest cost lever you control.
Sources
- Pool House Design and Construction: Styles, Layouts, and Building Considerations (Build-Construct)
- Pool House Cost Guide (Builds and Buys)
- Pool House Construction: Costs, Materials, Plans (Fox Blocks)
- Accessory Structure Requirements (Riverton City, Utah)
- Chapter 17.42: Accessory Structures (City of Rancho Cucamonga)